Rockwell Fab 8 & 9

Shurtleff & Andrews erected 5,000 tons of structural and miscellaneous steel on the Fab 8 and 9 buildings and the CUB building. The twelve (12) main Fab 9 trusses were erected over a seven day period and the 4,500 of the 5,000 tons were erected in seven weeks.