Zimmer Power Project

Shurtleff & Andrews furnished and erected 30,000 tons of structural steel for the Boiler, Turbine and Balance of Plant Structures. We erected 8,000 tons of mechanical items in sequence with the structural steel, including the piping, ductwork and equipment. We also erected all the conveyor galleries, head and tail pulley assemblies, chutework and actuator gates, silos, bins and crushers in sequence with the structural steel erection. Two 11320 American Sky Horse Crawler Cranes are in the boiler cavity erecting one of eight boiler support girders (200 tons each) at an elevation of 270 feet. Two 9310 American Sky Horse Crawler Cranes are outside the boiler erecting the Turbine Building and Coal Stations.